Misc stuff | 9.20.2020 - 9.24.2020

 Just an entry, no pictures. Worked on a bunch of random stuff, detailed below:

9.20.2020 - Panel layout planning

9.23.2020 - Fixed main gear door hardware, added locknuts and longer bolts. Tightened door hardware. Began door lock install (located drill points, ordered hole saws).

9.24.2020 - Reviewed seatbelt install instructions and researched options. Going to go with a different hardpoint solution than the factory aluminum. Ordered samples of seatbelt webbing. Ordered prop from Catto. (yaaaaaaaay!)

Comments