Main gear pulley hardware, gear system, battery tray install | 9.27.2020
I fixed some of the hardware on the main gear pulleys to get proper thread engagement on the lock nuts (no pics).
Disassembled the nose gear doors and sanded them and the opening to get the doors to fit somewhat tighter.
Cleaned and prepped the nose and sanded paint off for battery tray install. Installed battery tray with structural adhesive and rivets to hold it while it cured.
Drilling for rivet locations prior to sanding marking lines off. |
Mixing way too much structural adhesive |
Emily cut foam for seat bottoms and tested sewing with existing machine. Assisted with battery tray install.
Comments
Post a Comment