52. Cut out fuselage to allow main gear retract and complete transverse bulkhead installation. Verified. Will swing gear to check travel.
53. Install main gear bushings. These were installed properly.
54. Triax over main gear bushings. This was also done to spec.
55. Permanently install steel bushings in gear legs and make aluminum spacers. Verified.
Skipped to step 131.
131. Install Door hinges. These are installed but on the roof they're not filled yet, we want to fill those before we paint.
132. Install secondary lock in door. Also done.